2022-09-06

Precautions for installation and use of charging pile for new energy vehicles

As the charging equipment of new energy vehicles, the charging pile can be analogically understood as the oil and gas dispenser of conventional fuel vehicles. The charging pile is usually installed in public construction sites, parking lots or roads in residential communities. The charging pile is divided into AC charging pile and DC charging pile according to the mode of output current.



The AC charging pile is used to output AC power to the car. Its popular principle is similar to that of the supporting AC charger of other household appliances such as mobile phones and computers. It transmits AC power with specified parameters to the electrical equipment through internal voltage transformation.





Precautions for installation of new energy vehicle charging pile:




1、 Survey installation conditions. Before installing the charging pile, the first thing we need to do is to investigate whether we have installation conditions, such as whether there is a fixed parking space, how far away from the national grid line, etc.



Go to the property of the community to learn about the situation. When they go to the property to learn about the situation, they will also simply understand some relevant installation matters, such as the installation scheme, power consumption, installation area, etc. In fact, you don't have to worry because you don't understand, because the manufacturer will send relevant personnel to answer these professional questions.



2、 Select the Charge Point Type. There are two types of charging piles: wall mounted charging pile and vertical charging pile. The advantage of wall mounted type is to save space and the price is low, but it must be installed on the wall that can be wired. The price of vertical type is on the high side, and it will occupy a large space, but it can be installed in the empty parking lot around.



3、 It is necessary to know the type of power supply in the community. The power supply of our common charging pile is commonly used by ordinary residents. We need to apply to the State Grid for wiring in the power supply box. If it is approved as qualified, the State Grid will send corresponding staff to the site for wiring.



4、 Know about the parking space. Whether to fix parking space is a thorny problem. Even though some riders have fixed parking spaces for annual rent, few community properties are not allowed to rent parking spaces to install charging posts at all, and some owners can only install charging equipment after purchasing parking spaces, in order to facilitate management and avoid the trouble of equipment removal after rent back. So you should go to the property to know about the parking space in advance.



5、 Security issues cannot be ignored. In consideration of others' safety and public facilities, we are patient and careful in surveying. In fact, paying attention to safety issues is also responsible for others' safety. To avoid fire, electric leakage, short circuit and other problems caused by the charging pile.





Precautions for use of charging pile of new energy vehicles:




1. Before connecting the vehicle, ensure that the quick charging port of the vehicle is compatible with the charging plug on the charging pile, and confirm that there is no water or foreign matter in the charging plug and vehicle socket, and there is no damage, rust or corrosion.



2. Do not touch the charging plug pin and vehicle socket, do not touch the charging equipment and vehicle when lightning strikes, do not insert or pull the charging plug with wet hands or stand in rain or snow, and do not pull or twist the charging cable.



3. Before charging, ensure that the charging plug is correctly connected and locked with the vehicle socket.



4. During the charging process, if you are aware of peculiar smell, smoke coming out of the vehicle or charging equipment, or other dangerous situations, please immediately press the emergency stop button on the charging pile to stop charging. It is strictly prohibited to directly disconnect the charging plug.



5. When the charging is completed or the fault is terminated, the charging will stop automatically. When using the card to pay, please swipe the card for settlement. If you need to stop charging the card halfway, please swipe the card to stop charging and settle when paying. When paying without the card, please enter the verification code to stop charging and settle.







6. After charging, press the button on the charging plug after waiting for about 30 seconds. After confirming the unlocking, pull it out with care and force and put it back into the cradle on the charging pile. Do not discard it at will, which may cause the charging plug to be polluted.



7. Stop charging in case of thunderstorm and other bad weather.